Creating a new methodology using F-CDM-SSC-NM
The simplified modalities and procedures for small-scale projects permit the submission of proposals for new small-scale methodologies, or revision of existing methodologies:
Project participants involved in small-scale CDM project activities may propose changes to the simplified baseline and monitoring methodologies specified in appendix B or propose additional project categories for consideration by the Executive Board (4CMP.1 Annex II, paragraph 15).
In order to propose a new small-scale methodology, project participants must complete F-CDM-SSC-NM (Form for proposed new small-scale methodologies). F-CDM-SSC-NM requires the following information to be provided:
- The category to which the proposed methodology belongs (Type (i), Type (ii) or Type (iii))
- The technology/measure to which the methodology relates
- The project boundary for projects using the methodology
- The baseline scenario and the way the baseline is calculated
- If leakage emissions occur and how they should be calculated
- Possible project activity emissions and how they should be calculated
- Which parameters should be monitored and how they should be monitored (adapted from F-CDM-SSC-NM).
The latest version of F-CDM-SSC-NM is contained in EB 34, Annex 12 and can be downloaded here.
